Intelligently
prefabricated
Accelerate assembly processes and increase precision? Our Prefab system makes it possible. Thanks to a high degree of prefabrication, constructions are realized faster and sources of error are minimized. Complete modules can be delivered within 48 hours and installed easily – precisely planned, efficiently implemented.

Efficient Prefabrication
Clarity and speed for the construction site: The prefabricated modules reduce complexity. Fewer specialists assemble more and faster. Planning becomes more flexible: delivery within 48 hours. Punctual and complete.
Modular
the parts become a functional unit.
Scalable
in all directions, even if plans change.
Accelerated
through prefabrication and less on-site assembly time.

Efficient Prefabrication
Clarity and speed for the construction site: The prefabricated modules reduce complexity. Fewer specialists assemble more and faster. Planning becomes more flexible: delivery within 48 hours. Punctual and complete.
Modular
the parts become a functional unit.
Scalable
in all directions, even if plans change.
Accelerated
through prefabrication and less on-site assembly time.

Optimized Logistics
Two locations shorten the path to the destination. Centrally located in Europe, in Switzerland and Germany, the expert teams can quickly respond to all requirements. Our logistics service providers are certified by us. All customs formalities are professionally handled.
Faster
delivered because all logistics processes are systematized and optimized.
Worldwide
active for laboratory construction thanks to the globally networked supply structure.
Borderless
everything arrives on schedule. We take care of the formalities.

Optimized Logistics
Two locations shorten the path to the destination. Centrally located in Europe, in Switzerland and Germany, the expert teams can quickly respond to all requirements. Our logistics service providers are certified by us. All customs formalities are professionally handled.
Faster
delivered because all logistics processes are systematized and optimized.
Worldwide
active for laboratory construction thanks to the globally networked supply structure.
Borderless
everything arrives on schedule. We take care of the formalities.

Systematic Assembly
The high degree of prefabrication and pre-assembly within the versatile system simplifies assembly. The connection technology is simple and consists of few different parts. Clarity creates speed.
Delivered in 48h
The modules are plannable and punctual on the construction site. With all parts from stock.
Direct everywhere
Logistics are perfectly organized. Everything arrives at its destination on the desired date.
Complexity simplified
With fewer parts, the modules can be assembled quickly and without errors.

Systematic Assembly
The high degree of prefabrication and pre-assembly within the versatile system simplifies assembly. The connection technology is simple and consists of few different parts. Clarity creates speed.
Delivered in 48h
The modules are plannable and punctual on the construction site. With all parts from stock.
Direct everywhere
Logistics are perfectly organized. Everything arrives at its destination on the desired date.
Complexity simplified
With fewer parts, the modules can be assembled quickly and without errors.